Terminal

CPC Marine Terminal (Yuzhnaya Ozereyevka)

Novorossiysk, Krasnodar Krai

Operational

44.63°N, 37.76°E

About this asset

The Caspian Pipeline Consortium's Black Sea loading complex west of Novorossiysk, exporting Tengiz and other Caspian crude via single-point moorings. Transneft is the largest Russian shareholder in the system.

Highlights

  • Caspian Pipeline Consortium seaboard terminus
  • Offshore single-point mooring loading
  • One of the Black Sea's largest crude outlets

Export throughput

83

M t/yr

Operator

Transneft-p

Commissioned

2001

Workforce

1,800

Details

Coordinates

44.63000°, 37.76000°

Location format

WGS84 · Decimal degrees

Site location

Novorossiysk, Krasnodar Krai

Installed equipment

Loading equipment...

TRNFPOwned & operated byTransneft-p