Terminal
Arctic LNG 2 (Utrenniy Terminal)
Gydan Peninsula, Yamalo-Nenets AO
71.60°N, 73.30°E
About this asset
NOVATEK's next Arctic LNG megaproject on the Gydan Peninsula, built around gravity-based structure platforms and the Utrenniy port with liquefaction trains ramping toward full capacity.
Highlights
- Gravity-based structure liquefaction trains
- Utrenniy Arctic port and offloading berths
- Resource base in the Utrenneye field
LNG capacity
19.8
M t/yr
Operator
NOVATEK
Commissioned
2023
Workforce
5,000
Details
Coordinates
71.60000°, 73.30000°
Location format
WGS84 · Decimal degrees
Site location
Gydan Peninsula, Yamalo-Nenets AO
Installed equipment
Loading equipment...